In the Press

Jakarta Skyscraper Would Harness the Wind

Designed SOM, the Pertamina Energy Tower, is able to generate about 25 percent of the power necessary to operate the building with the aid of a massive turbine grill at its top. The 1,740-foot building has a scheduled completion date of 2020, and would accommodate up to 20,000 Pertamina employees.