Image © SOM
Designed SOM, the Pertamina Energy Tower, is able to generate about 25 percent of the power necessary to operate the building with the aid of a massive turbine grill at its top. The 1,740-foot building has a scheduled completion date of 2020, and would accommodate up to 20,000 Pertamina employees.